Overview

*METAL STRUCTURAL INSULATED (MSI) curtain wall, indicated in the above image, is a part of structure ststem, which, in whole,can be used for low rise building like G+1 to G+3 buildings like staff accommodation, hostels, schools, guard house etc. In tall or high rise buildings,a part of LGS system can act as well as frame(LPG Curtain Wall) shown above, which is used specifically for insulating the building to save air-conditioning cost by 20 to 25%,apart from reducing the dead weight of building. The above image is a perfect and unbeatable combination of structure for hotels, hospitals,malls, office buildings, where early completion of project and operationalcost of building is of prinme imporatance. Yet another advantage for such structure.

Product: MS STEEL BUILDINGS

S No. Structure
Combination
Stage of work Advantages
I RCC Column + RCC Beam + Speed Floor + Mesh Under Construction Complete removal of slab shuttering & deshuttering using props, Reduction in steel and concrete in slabe, early occupancy, Reduction in project Managment Cost.(Early completion of slab by 14 to 21 days)
II RCC Column + RCC Beam + Speed Floor + Mesh Planning and Design Stage Reduction in concrete,reinforcement or both for foundations,column and beam, reduction in steel and concrete in slabs, complete removal of slabs shuttering and deshuttening using props.Early occupancy, reduction in project managment cost. (Early completion of slab by 14 to 21 days)
III RCC Column + RCC Beam (JSPL Hot Beam Sections) + Speed Floor + Mesh Planning and Design Stage Complete removal of vertical props for beams and columns. Reduction in conccrete and steel in foundations and columns,shuttering, early occupancy, reduction in project managment cost.
IV HRS Column + HRS Beam +Speed Floor + Mesh Planning & Design Stage Heavy savings in concrete & steel in foundations. Any shuttering if required is only for foundation and retaining walls. Reduction in steel and concrete in slabs. Reduction in project Managment cost.(Early completion by 30-50% time compared to RCC Buildings)

ADVANTAGES